50px

Corrections to pipes for sewer systems phase 1 to 4 

50px
Corrections to pipes for sewer systems phase 1 to 4
  • January 27, 2020

PROJECT DESCRIPTION: Replacement of storm and sewer pipe systems with poor structural conditions identified in the existing infrastructures. Upgrades of paved streets with insulated foundations.

LOCATION: Wemindji, James-Bay 

CLIENT: Cree Nation of Wemindji

ENGINEER: ARPO Groupe-Conseil

CONSTRUCTION COST: 2M$

YEAR: 2014-2019

50px
Bloc main.blocs.image
50px
Bloc main.blocs.image
50px